This metal structure was built after a careful development and complex design study through the analysis of the various details that compose it: from the smoke pipe to the oven box, passing to the walkways, to the air ducts to get to the gas pipes including the complete assembly of the entire group. The task of assembling this structure was assigned to qualified Omifer personnel, who worked meticulously for the assembly with accurate precision. Everything was completed in a year and, with the approval of the customer, we started the disassembly, cataloging each component through plates and packing lists, organizing oversized transport for air ducts larger than 3 m and with precise programming for the entire remaining part. This material has been addressed to packers who have provided for their insertion in containers with the necessary procedures and certification of the materials used for overseas transport.